The tube diameter is chosen to fit existing pipe system and so is the number of integrated anti-static bars. Simco-Ion anti-static ionising bars can also be integrated into a pipe provided by the client. The anti-static bars are arranged in two series. They are connected to a two-phase power unit to ensure optimal ionisation at high velocities.
On request:
LB2A4S